INMGT-445 – Business Process Mgt. (BPM)
Assignment – Final Project Part 3 – 20 pts. – REVISED
Objective
This assignment is intended to address,
Course Objective 2 – Analyze existing processes within an organization utilizing process modeling tools and methods.
Course Objective 3 – Design new and improve existing business processes.
Course Objective 4 – Analyze process implementation aspects of performance management, change management, and process transformation.
Course Objective 5 – Plan for value realization, embedding BPM in an organization, and sustainability of process implementation.
Course Objective 6 – Analyze BPM technologies to enable change and improve process capabilities.
Reference
The Process Improvement Handbook
Business Process Management CBOK
Assignment
This assignment is Part 3 of the 3-part Final project assignment. The Final Project will be looking at the business processes and quality of an existing organization. You will need to use the organization used previously for Parts 1-2 of the Final Project.
Be sure to reference information using APA guidelines (ie. KEMET document, “Retrieved 8/5/2020 from https://sh.kemet.com/Lists/FileStore/KEMET_Quality_Manual.pdf”
Complete the following activities and submit to the assignment dropbox.
Roles & Responsibilities Matrix for the Quality Organization (template PIH Figure 10-27). Consider rows to be the Quality Organization process steps and columns to be business and quality functions, ie. Engineering, Manufacturing, Quality Assurance, Quality Auditing. Use Key in Figure 10-27 to fill cells with information – P, A, I, R, S. (10 pts.)
SWOT analysis of the business process management for the organization (template BPM CBOK, Section 3.1.12.2, p.71) (10 pts.) Include potential process bottlenecks in weaknesses.
Grading
Roles and Responsibility Matrix (10 pts.)
5 organization process steps for rows
4 function columns
2 pts. for each organization row with 4 columns fully completed (0.5 pts. per column)
Use Key in Figure 10-27 to fill cells with information – P, A, I, R, S
SWOT Analysis (10 pts.)
Describe 3 major Strengths (3 pts.)
Describe 3 major Weaknesses, including potential process bottlenecks (3 pts.)
Describe 2 Opportunities (2 pts.)
Describe 2 Threats (2 pts.)
INMGT445 Final Project Part 3 (3)
The post INMGT-445 – Business Process Mgt. (BPM) Assignment – Final Project Part 3 appeared first on PapersSpot.