1 Develop the Work Breakdown Structure (WBS) for a Wastewater Processing Plant construction project. The WBS should contain three levels and at least 10 Work Packages. 2. Download and installProjRisk (trial) or (for Mac users) ProjRisk can be accessed on theRemote Lab. For the project outlined below: Activity Duration (days) Precedent Cost A 5