You have been asked to conduct a preliminary study to identify one location on the Eyre Peninsula (South Australia) that may be appropriate for a pumped hydropower facility. The client has provided nothing specific, nor any data. It is expected that you will: Identify at least one potential area for pumped hydropower systems. Provide an indication of work required for installation of any farms/systems. Justify any assumptions you make.
Mechanical engineering You are to write a consulting report of no more than three pages in length for the body (Introduction to Conclusion), plus all calculations…