What do you consider to be the most uncertain factor – and why?
A risk analysis of a proposed incinerator and recycling system for very dangerous industrial waste is to be performed. The system is located close to a residential area. The analysis shall also cover the transport to and from the system through the residential area. Assume that you are responsible for the uncertainty of the risk … Read more