Write My Paper Button

WhatsApp Widget

Question 1: To save money, the quality control engineer at a plant decided to use a sample of size n=2 on a line producing 500 parts per chart. (a) What could you tell him about the advisability of using such a small sample? (b)What effect will this approach have on the control charts and the information they will yield. (5 marks)

Question 1: To save money, the quality control engineer at a plant decided to use a sample of size n=2 on a line producing 500 parts per chart. (a) What could you tell him about the advisability of using such a small sample? (b)What effect will this approach have on the control charts and the information they will yield. (5 marks)

Question 2: (a) Why is it so important that sampling g schemes be carefully chosen? (b) Give an example of how an unwise selection of a sampling scheme can affect the resulting usefulness of the control charts made? (4 marks)

Question 3: Suppose you take a random sample of 40 from a lot of 1,000 items but later realise that you should have selected a sample of 70 items instead. How do you correct this error? Should you put the 40 items back and draw the required random sample of 70 from the original lot, or should you simply draw an additional random sample of 30 from the 960 remaining items?

(2 marks)

Question 4: The results of laboratory consolidation tests (sample of size 1) for four soil samples obtained from 4 different strata are given in table 1. These test results are used to compute the soil settlement that will occur if a certain load is placed on these strata. In building industry, high soil settlement means more movement in the building.

Use X-bar (with test options at raw 1, 5 and 8) and Moving rang charts to monitor consolidation data on these strata by answering the following questions.

  1. Interpret the charts for each site, comment on the Patterns or trends in each chart.
  2. Is there evidence that the soil settlement for these strata is uniform between the four sites? Explain your reasons.
  3. Which site would you recommend using? Explain your reasons.
  4. The manger was hoping to see the average soil settlement of 10.2 in all these strata. Continue you charting process similar to part (a) by using this value as your process mean. Interpret the new charts.
  5. Is the manager’s expectation of the soil settlement level a correct assumption? Explain your reasons.
  6. Which one of these strata would you recommend based on part d analysis? Explain your reasons.
  7. Write a100 words repot for the manager to communicate your finding and guide him to choose the best site.

 

 

 

 

 

Site 1 Site 2 Site 3 Site 4
9.7959 10.9076 9.4409 13.1946
8.7790 9.3148 7.3330 12.2903
11.6251 10.9922 7.5492 12.2046
10.6764 11.4413 7.9515 13.2692
10.4865 10.7417 7.7210 12.0333
11.6350 10.6445 8.8807 13.3472
8.3130 11.0823 8.9115 11.6671
9.2793 10.5391 9.5956 12.1243
9.2917 11.0755 8.9191 11.9862
10.5097 10.1638 8.1121 11.2154
10.2084 11.1507 10.3723 11.8289
9.4184 10.1381 8.5451 10.7120
10.5037 8.1387 8.6079 12.8071
9.5284 10.4141 9.4695 12.5941
9.5115 10.2263 9.1592 12.8422
9.2679 10.6389 11.3781 13.1562
10.4708 10.6315 8.6509 11.4001
10.7232 9.6346 10.0506 11.3515
11.0403 10.1104 9.6920 11.3908
10.0987 11.6428 7.2472 12.2071
7.5510 11.3604 10.1491 12.3324
9.9498 12.1617 8.5718 12.7403
10.0922 10.8213 8.2289 11.0279
9.6299 9.8491 9.9954 12.2233
9.9857 9.9320 8.2156 11.6305

 

 

 

 

Site 1 Site 2 Site 3 Site 4
9.7959 10.9076 9.4409 13.1946
8.7790 9.3148 7.3330 12.2903
11.6251 10.9922 7.5492 12.2046
10.6764 11.4413 7.9515 13.2692
10.4865 10.7417 7.7210 12.0333
11.6350 10.6445 8.8807 13.3472
8.3130 11.0823 8.9115 11.6671
9.2793 10.5391 9.5956 12.1243
9.2917 11.0755 8.9191 11.9862
10.5097 10.1638 8.1121 11.2154
10.2084 11.1507 10.3723 11.8289
9.4184 10.1381 8.5451 10.7120
10.5037 8.1387 8.6079 12.8071
9.5284 10.4141 9.4695 12.5941
9.5115 10.2263 9.1592 12.8422
9.2679 10.6389 11.3781 13.1562
10.4708 10.6315 8.6509 11.4001
10.7232 9.6346 10.0506 11.3515
11.0403 10.1104 9.6920 11.3908
10.0987 11.6428 7.2472 12.2071
7.5510 11.3604 10.1491 12.3324
9.9498 12.1617 8.5718 12.7403
10.0922 10.8213 8.2289 11.0279
9.6299 9.8491 9.9954 12.2233
9.9857 9.9320 8.2156 11.6305

 

Assignment 1 Rubric

 

Ratings Pts
Assessment Criteria 1 – Elucidate techniques and concepts of Statistical Quality Control. 10.0 pts

High Distinction

7.5 pts

Distinction

6.5 pts

Credit

5.5 pts

Pass

0.0 pts

NN

10.0
Assessment Criteria 2 – Construct the appropriate Quality Control charts / Forecasting and

critically discuss the role of such charts / models in monitoring a process.

10.0 pts

High Distinction

7.5 pts

Distinction

6.5 pts

Credit

5.5 pts

Pass

0.0 pts

NN

10.0
Assessment Criteria 3 – Assess the ability of a process to meet customer expectations.

Explain technical material, without unnecessary jargon, to lay persons.

such as the public or line managers.

 

10.0 pts

High Distinction

7.5 pts

Distinction

6.5 pts

Credit

5.5 pts

Pass

0.0 pts

NN

10.0
Total points: 30 40.0

 

Total Quality Management, task on Practical package utilisation and report writing on control charting.

 

Criteria Ratings Pts
This criterion is linked to a learning outcomes 1, 2

Question 1

5 Pts

5 Point Full Mark

1(a) (1 mark) 1(b) effect on the charts (2 marks) 1(b) information regarding process (2 marks)

 

0 Pts

No Marks

 

8 pts
This criterion is linked to a learning outcomes 1, 2

Question 2

4 Pts

4 Point Full Marks

2(a) Explanation (2 marks), 2(b) example (2 marks).

0 Pts

No Marks

 

10 pts
This criterion is linked to a learning outcome 1

Question 3

2 Pts

2 Point Full Marks

Logical reason (2 marks)

0 Pts

No Marks

 

8 pts
This criterion is linked to a learning outcomes 1, 2

Question 4

19 Pts

19 Points Full Marks

4(a) Chart setting (1 mark) Chart interpretation (3 marks), 4(b) logical reason (2 marks)

4( c) logical reason (2 marks), 4(d) Chart setting (1 mark) Chart interpretation (3 marks),

4(e) logical reason (2 marks), 4(f) logical reason (2 marks), 4 (g) Report within

the 100 word limit (4 marks).

 

0 Pts

No Marks

 

4 pts

 

The following marking break will be applied To Explanation/ interpretation section of each question.

Criteria Not acceptable

(0)

Needs Improvement

(25%-50%)

Good

(75%)

Outstanding

(100%)

Explanation/

Interpretation

No clear conclusion/answer to the question

 

Needs improvement on the following,

– State conclusion

– Adequate response to the question/ task

– Restatement of argument/

 

Could improve the following

– Coherent statement of conclusion/s

– Clear response to the question/ task

– Clear restatement of argument/ findings

 

Information builds a strong and interesting rationale driving the investigation. Important concepts are detailed.

 

Don`t copy text!
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
???? Hi, how can I help?