Work Breakdown Structure (WBS)
Cancer Care Centre
Project Location
Location Identification
Site Planning Survey
Environmental Consideration
Plan
Decision on Plan
Architect Design
Review Design
Making Necessary Changes
Construction
Foundation
Construction measurement
Excavation and Levelling
Steel Erection
Wood Forming
Concrete Pouring
Floor Back Filling and Compaction
Masonry
Erecting Reinforced Concrete
Bricks Filling
Utilities
Electrical Utilities
Electrical Wiring
HVAC
Power Backup Installation
Installation of Cancer Machines and Equipment
Mechanical Utilities
Plumbing and Fitting
Aluminum and Steel Works
Sewerage System Installation
Roofing
Roof Framing
Iron Sheets
Finishing
Doors and Windows
Plastering
Placing Window Panes
Painting
Landscaping
Project Close
Inspection
Commissioning and Handover