BUSI 313 Project: Planning and Organizing Grading Rubric Criteria Levels of Achievement

BUSI 313

Project: Planning and Organizing Grading Rubric

Criteria 

Levels of Achievement 

 

Content 70% 

Advanced 

Proficient 

Developing 

Not present 

Points Earned 

Part 1 – 35 points

32 to 35 points

Questions 1–5 are correctly answered. Screenshots include:

Gantt chart

Network Diagram with Critical Path Highlighted

Schedule Table (Gantt chart) reporting ES, LS, EF, LF, and Slack for each Activity

25 to 31 points

3 or more questions are answered correctly. Portions of the required screenshots of included.

1 to 24 points

At least 1 or more of the questions are answered correctly and only a portion of the required screenshots are shown.

0 points

Nothing present

 

 

 

 

 

Part 2A – 35 points

32 to 35 points

Uses a memo format to management addressing questions 1–5. Two Schedule Tables (Gantt charts):

One showing leveling within slack

One showing Free and Total Slack depicting the resource constrained schedule

26 to 31 points

3 or more questions are answered correctly. Portions of the required screenshots of included. The memo format is not used properly.

1 to 25 points

At least 1 or more of the questions are answered correctly and only a portion of the required screenshots are shown and no attempt at the memo format.

0 points

Nothing present

 

Part 2B – 35 points

32 to 35 points

Uses a memo format to management addressing questions 1–3. Two Schedule Tables (Gantt charts):

One showing leveling within slack

One showing Free and Total Slack for the new schedule

25 to 31 points

2 or more questions are answered correctly. Portions of the required screenshots of included. The memo format is not used properly.

1 to 24 points

1 of the questions is answered correctly and only a portion of the required screenshots are shown, no attempt at the memo format.

0 points

Nothing present

 

Structure 30% 

Advanced 

Proficient 

Developing 

Not present 

Points Earned 

Microsoft Project File – 35 points

32 to 35 points

All Holidays are entered. Project set to 8 hour days/5 day week. Tasks entered and indented properly. Predecessors correctly applied. Proper resources added with proper cost. Proper resources assigned to proper task

25 to 31 points

Portions of the required info is added, but not all.

1 to 24 points

Minimal information is added, but not near the required amount.

0 points

Nothing present

 

Format – 10 points

9 to 10 points

Sufficient content, clarity, and organization of ideas are provided, proper spelling and grammar are used.

7 to 8 points

Average performance on content, clarity, organization of ideas, and grammar/spelling usage.

1 to 6 points

Below average performance on content, clarity, organization, and grammar/spelling.

0 Points

Nothing present

 

Total Points 

/100 

     Instructor’s Comments: 

Page 2 of 2

The post BUSI 313 Project: Planning and Organizing Grading Rubric Criteria Levels of Achievement appeared first on PapersSpot.