✍ ️Get Free Writing Help
WhatsApp

University of Balamand Issam Fares Faculty of Technology Terms of References Construction

University of Balamand

Issam Fares Faculty of Technology

Terms of References

Construction of XXXXXXXXXXXXXXX

2020

CHAPTER 1: INTRODUCTION AND PROJECT DESCRIPTION

Article I. About the contract

Objectives

The objective is to build ………

Work includes:

Drawings of the units (Annex I):

Article II – Documents to which the undertaking contracting is subject to

This contract shall be subject to the following provisions and documents:

Tender Dossier.

Terms of References.

Drawings with Structural Shop Drawings details.

Bill of Quantities

Article III – Understanding Project Details

Details related to the site location, site conditions.

Article IV- Execution of Works

The Contractor shall be aware that the work must be carried out….

Article V – Provision of materials and equipment

The materials, tools and supplies used in the work shall be…

Article VI – Supervision of works

The field supervision of the execution of works shall be carried out by a supervising body set up by the project management team. The contractor must comply with all instructions and written instructions of the project management team as related by the supervising body within the limits of the powers of the contractor and as stipulated in the TORs. The supervising body shall ensure full compliance in the spirit of cooperation and according to the following instructions:

Any work that does not conform to the specifications, levels and measurements specified in the plans shall not be paid. Furthermore, the contracting authority reserves the right to request from the contractor the replacement of such works at the contractor’s expense and responsibility. Otherwise the supervising body shall execute it at the expense and responsibility of the contractor.

Article VIII Documents to be included in the offer

The offer should include the following:

All required documents in the tender dossier.

A brief outline of the program and stated timeline for the completion of works in accordance with the current TORs.

CHAPTER II: SPECIAL INSTRUCTIONS

Special specifications

Includes cutting and welding metallic material according to the adopted Structural Shop Drawings dimensions shown in Annex I & II taking into account the following specifications:

Reinforced concrete works

Only ready mix concrete supported by an official certificate from the ready mix concrete company is acceptable for the construction of slabs and according to the following specifications:

High Sulfate Resistant Portland Cement (Grade V); British Standard BS 5328

Water/Cement ≤ 0.45

Minimum Resistance XX MPa

Nominal reinforcement cover greater than 35mm

The contractor must present the official certificates from the ready mix concrete companies to ensure the quality of the concrete according to the specifications listed above.

Annex I: Structural Shop Drawings

1

The post University of Balamand Issam Fares Faculty of Technology Terms of References Construction appeared first on PapersSpot.

Don`t copy text!