✍ ️Get Free Writing Help
WhatsApp

Assessment Scenario Scenario 1: The Crystal, London, United Kingdom Flagship sustainable development by Siemens, located at Royal Victoria Dock. Designed by Wilkinson Eyre Architects, opened 2012. Features green te

Assessment Scenario

Scenario 1: The Crystal, London, United Kingdom

  • Flagship sustainable development by Siemens, located at Royal Victoria Dock.
  • Designed by Wilkinson Eyre Architects, opened 2012.
  • Features green technologies: solar energy, rainwater harvesting, smart energy management.
  • First London building to receive BREEAM Outstanding and LEED Platinum certifications.
  • Repurposed in 2022 to house Greater London Authority’s City Hall.

Research Links:

  1. The Crystal by Wilkinson Eyre Architects – Re-thinking The Future
  2. The Crystal / Wilkinson Eyre Architects – ArchDaily
  3. Townshend Landscape Architects – The Crystal, London

Scenario 2: Self-Selected Case Study

  • Choose a real-life engineering project from any industry or country.
  • Resources: World Bank Projects & Operations
  • Students must ensure:
    • Sufficient publicly available information.
    • Project aligns with learning outcomes.
    • Complexity matches student skill level.

Assessment Tasks

You are acting as a specialist project management consultant and required to produce a 5,000-word management report analyzing the case study project.

Task 1 (LO1) – Evaluate Internal & External Influences

  • Objective: Systematically analyse internal and external influences on project management practice and sustainability.
  • Guidelines:
    • Critically analyse influences on the organisation and project selection.
    • Evaluate sustainability considerations and recommend strategies.
  • Marking Criteria:
    • Critical appraisal, relevance to the case study, deep analysis.
    • Higher marks for evaluation answering how, why, what if, so what.

Task 2 (LO2) – Analyse Complex Situations for Decision Making

  • Objective: Critically analyse constraints and stakeholder engagement.
  • Guidelines:
    • Identify and evaluate project constraints.
    • Analyse stakeholders and propose engagement strategies.
  • Marking Criteria:
    • Critical evaluation of constraints and stakeholder management.
    • Evidence-based, specific to the case study.

Task 3 (LO3) – Synthesise Information from Diverse Sources

  • Objective: Analyse risks and resources required for the project.
  • Guidelines:
    • Identify key risks and mitigation strategies.
    • Appraise and categorise resources; evaluate deployment challenges.
  • Marking Criteria:
    • Application of risk management theory and best practice.
    • Case-study specific, critical analysis.

Task 4 (LO4) – Communicate Complex Ideas

  • Objective: Demonstrate leadership, conflict management, and project communication.
  • Guidelines:
    • Describe sources of conflict and propose resolution strategies.
    • Recommend project manager leadership strategies to improve success.
  • Marking Criteria:
    • Application of communication management theory and best practice.
    • Relevance to case study and critical evaluation.
Don`t copy text!