A levelling survey between the centre point of the kerb at the East entrance and the gully grating at the South entrance on the Holly Hill site. Include all manhole covers and intermediate levels between stations at convenient centres
Higher National Diploma |
||||||
Year 2 |
BUILDING SURVEYING, BUILDING STUDIES, CONSTRUCTION MANAGEMENT |
2019-2020 |
||||
Site Engineering and Surveying |
Unit: 0042 |
|||||
Topic: Levelling |
Assignment:1 |
|||||
Name: | Assessment Criteria Sheet | |||||
Assessment Criteria | `%` | Mark | ||||
1 |
Organisation and coherence of the work |
10 |
|
|||
2 |
Contents of work is clearly related to the area of study and learning outcomes |
20 |
|
|||
3 |
Level of analysis and synthesis |
25 |
|
|||
4 |
Use of literature and showing knowledge and understanding |
20 |
|
|||
5 |
Clarity of Expression- clearly expressed, articulate and fluent (accurate spelling & calculations. Legibility, Professionalism (include sketches and pictures where necessary) |
15 |
||||
6 |
Quality of referencing and the use Harvard Referencing system |
10 |
||||
Total |
100 |
|||||
Higher National Diploma | ||
Year 2 | Site Engineering and Surveying | Assignment: 1 |
Unit: 0042 | Brief | |
Aim Task
|
To be able to undertake a generic level survey so that the methods used can be re-used in other surveys at other times.
Using levelling instrument and graduated staff level, level the stations of two controlled traverses as indicated by your tutor. Undertake the following two surveys: i. A levelling survey between the centre point of the kerb at the East entrance and the gully grating at the South entrance on the Holly Hill site. Include all manhole covers and intermediate levels between stations at convenient centres.
Prepare a report that covers the following: The data obtain for each of the survey and use both the HPC and the rise and fall methods to calculate the reduced level at every station. Show all the necessary check to validate your calculation. Explain briefly the steps used in carrying out the surveying task and include diagram where necessary. Check the mis-closure error for the flying survey and update the values for the reduced level. If the error exceeds 50mm, repeat the process until the results are within required tolerance. Identify and discuss four sources of errors encountered during the surveying task and explain how these errors could be minimised. Plot the sectional view for each of the survey based on the computed results and briefly discuss the outcome. Explain the application of levelling in the field using three different examples. |
|
Word Count: 1500 words – maximum |
||
Weighting: 40% |